In Appalachian oil and gas country, the road to a well pad or a pipeline right-of-way often crosses a creek, a drainage or a wet bottom. Getting crews, water trucks, and equipment across it without tearing up the stream is an everyday planning problem. Temporary bridges for oil and gas access are one of the simplest answers. A timber bridge goes across the channel, stays while the work lasts, and comes out when you’re done.
This guide covers where temporary bridges fit on oil and gas jobs, how to match a bridge to the traffic you’ll put on it, and what to have ready before you call us. Everything about our bridges here comes from our published product information. Your engineer and your permitting agency still make the final calls for your site.
Why stream crossings slow down oil and gas access
A stream crossing is often the slowest part of a new lease road, a pad expansion or a pipeline right-of-way. It can’t be skipped, and doing it wrong causes trouble that lasts longer than the job. Common pressure points:
- Heavy, repeated traffic. Pads and right-of-ways see loaded trucks and equipment crossing many times a day, not once.
- Sediment and bank damage. Fords and poorly built crossings put mud in the water and break down the banks, and that’s what regulators and landowners notice first.
- Short timelines. Many crossings are needed only through drilling, construction or a maintenance window, so building a permanent structure rarely makes sense.
- Remote sites. The crossing has to be placed with whatever equipment can reach the site.
Our temporary stream crossing bridges are built for exactly this. They’re used for access across streams during exploration, temporary crossings during pipeline construction, and access for maintenance and inspection work.
Where E&H comes from: oilfield equipment and timber bridges
E&H Manufacturing has supplied equipment to the oilfield for more than 40 years from central West Virginia. We build conventional surface production equipment for the Appalachian Basin: gas production units, in-line heaters, measurement equipment, ASME pressure vessels and storage tanks. Our corporate officers have been with the company since day one and bring more than 100 years of combined experience. We’re members of the Independent Oil & Gas Association of West Virginia, the West Virginia Oil and Natural Gas Association, the Kentucky Oil & Gas Association, the Virginia Oil & Gas Association and the Southeast Ohio Oil & Gas Association.
We’re also a leading supplier of stress-laminated timber bridges, and these spans have been heavily used in the timber and oil and gas industries. The same crews who know a separator or a meter run also know what a lease road has to carry. We’re happy to submit the documentation needed to get on your vendor list.
Keeping work out of the stream
Our timber bridges span the channel with no in-stream construction, and they help keep debris out of the waterway. Our bridge systems help drillers and loggers meet and exceed Best Management Practices for stream crossings by minimizing stream siltation and erosion during installation, use and removal of the bridge.
A few practical points for oil and gas crossings:
- Set the supports back from the edge. Our stream crossing guidance places abutments behind the top of the bank where possible and stages bridge sections away from the water’s edge.
- Plan the removal at the start. A temporary crossing is only low-impact if it comes out cleanly. Decide when and how it leaves before it goes in.
- Know which rules apply. Our stress-laminated timber bridge systems meet the requirements of Virginia Department of Environmental Quality (DEQ) Specification 3.24. Requirements vary by state and project, so review your permits early. Our posts on temporary bridge permitting basics and stream disturbance permits in West Virginia are a good starting point. Your permitting agency has the final word.
Matching the bridge to the traffic

The most important question for any oil and gas crossing is what is going to drive over it. Our professionally engineered, pre-stress-laminated timber bridges are certified to carry a maximum load of 80,000 pounds. They are designed to meet American Association of State Highway and Transportation Officials (AASHTO HS-20-44) specifications. Our patented Shear Key design lets each bridge work as a single, solid structure, with weight spread evenly across the whole bridge.
Not every model is rated for the maximum. Our standard models have different deck thicknesses and published load capacities. The lighter models are rated for lighter vehicle classes, and the top-rated models reach 80,000 pounds.
To match a bridge to your traffic:
- List your heaviest vehicles. Think about the loaded water truck, the equipment hauler or the crane truck, not just the pickups.
- Get gross and axle weights. Compare them with the bridge’s published rating, using the method in our guide to load ratings for temporary bridges.
- Flag anything over the rating. If a load is above what a bridge is rated for, don’t cross it. Call your engineer and us before that load is scheduled.
Span and width
Measure the gap you need to cross, then add room for supports on each bank. Our bridges come in 30-foot and 40-foot lengths, designed for maximum spans of 20 feet and 30 feet. A standard bridge ships as two fully assembled panels with 6″ x 6″ timber bumper guards down each side. Once installed, it gives a 12-foot-wide driving surface. Check that this width works for the widest vehicle you plan to run, and for any turn it has to make coming off the approach.
Short jobs and long programs
Oil and gas access doesn’t all last the same length of time. A crossing may be needed for a few weeks of construction or for years of production traffic. We offer stress-laminated timber bridges for temporary or permanent use, for sale or lease. A rental contract is available on our bridge page.
Because the bridges are built to be removed, a crossing that’s no longer needed on one lease can be relocated to the next job instead of being abandoned. Our temporary bridge overview covers how the bridges are reused across sites and industries.
Placing the bridge with equipment you already have

Each bridge is designed for fast, easy installation with a dozer, excavator or boom truck. That’s equipment most pad and pipeline sites already have on hand. Site work usually comes down to leveling the approaches, preparing simple supports on each bank, and connecting the approaches to your road. Our post on site preparation for temporary bridges goes into more detail.
What to send us for a quote
You’ll get a faster, more accurate answer if you have these ready:
- The measured gap and bank conditions at the crossing (photos help)
- Your heaviest vehicles, with gross and axle weights
- How long you’ll need the crossing, and whether you want to buy or lease
- The site location and any permit conditions you already know about
For more detail, see how to get a detailed temporary bridge quote.